City of Staunton
Home MenuMS4 Program
The City is required to develop, implement, and enforce an MS4 (Municipal Separate Storm Sewer System) Program to comply with coverage under General Permit No. VAR04, issued by the Virginia Department of Environmental Quality.
The MS4 Program must include an MS4 Program Plan that includes six minimum control measures and special conditions for the approved Chesapeake Bay TMDL (Total Maximum Daily Load).
Six minimum control measures of the program include:
- Public education and outreach
- Public involvement and participation
- Illicit discharge detection and elimination
- Construction site runoff control
- Post-construction runoff control
- Pollution prevention and good housekeeping
If you have any questions or comments on Staunton's MS4 Program, please contact us via the Stormwater Hotline email (StauntonStormwater@ci.staunton.va.us) or phone (540.213.6517)
MS4 Program Plan and Annual Report
The City files an MS4 Program Plan and Annual Report with the Virginia Department of Environmental Quality, which include detailed information on control measures, including objectives, expected results and implementation schedules.
Coverage Letters:
Program Plans:
Annual Reports:
- MS4 Annual Report - 2024-2025
- MS4 Annual Report - 2023-2024
- MS4 Annual Report - 2022-2023
- MS4 Annual Report - 2021-2022
- MS4 Annual Report -2020-2021
- MS4 Annual Report -2019-2020
- MS4 Annual Report -2018-2019
- MS4 Annual Report -2017-2018
- MS4 Annual Report -2016-2017
- MS4 Annual Report -2015-2016
- MS4 Annual Report - 2014-2015 (rev. 02/16/2016)
- MS4 Annual Report -2013-2014
Chesapeake Bay TMDL Action Plan:
Chesapeake Bay TMDL Implementation Annual Status Report:
- TMDL Implementation Annual Status Report 2024-2025
- TMDL Implementation Annual Status Report 2023-2024
